Santa Cruz de Tenerife
Output
Projects
(2023 — 2025)

Hippo Build
From whiteboard conceptualization to a $1M capital raise. 14 weeks. Solo product lead across strategy, design, and engineering.

Spring
One unified design system architecture. 6 distinct hospitality brands. Absolute consistency without identity dilution.

SaaS Landing Rebuild
Identical product engineering, calibrated positioning narrative. Conversions optimized from 0.9% to 3.4%.

Sports Tech Platform
Full application architecture designed and pushed live to production in 12 weeks. Zero handoff friction.
